Town of Southborough Underground Tank Removal and Aboveground Tank Install
CommTank removed two existing 12,000-gallon underground storage tanks (USTs) at the Southborough Public Works Garage and replaced them with two 6,000-gallon aboveground storage tanks (ASTs) manufactured by Stanwade Metal Products, Inc. The tanks are being used to provide gasoline and diesel fuel to the trucks and machines operated by the DPW.
As part of this project, CommTank provided temporary fuel storage tanks, two new 6,000-gallon double wall Fireguard ASTs, new Wayne Select Series fuel dispensers, Veeder-Root TLS 300C automatic tank gauge, and Wayne Ix Fleet™ Fuel Control System. The work included all material, equipment, labor, and testing to provide complete working systems.
Summary of the fuel storage tank installation project:
- Install fencing and erosion controls around the work area
- Expose top of UST
- Pump. Clean, remove UST, field screen soil, pass inspection, start backfilling
- Finish Backfill and Compact
- Remove existing canopy and dispensers
- Install Canopy Footings
- Install underground electrical conduits
- Form and pour new pad and bollards
- Install Canopy
- Place, secure and test new ASTs
- Install accessories on top of ASTs including dispensers
- Remove fence, clean up and demobilization
- Provide programming and training
Project Categories
Above Ground Tank Installation |
Above Ground Tank Removal |
Building Operations and Maintenance |
Day Tanks |
Field Welded Tanks |
Fuel Dispensers and Management Systems |
Fuel Filtering |
Fuel Tank Rentals |
Gas Station Construction |
Oil Spill Cleanup |
Storage Tank Management Program |
Tank Cleaning |
Tank Component Upgrades |
Tank Inspection |
Tank Lining |
Tank Painting and Coating |
Tank Restoration |
Tank Testing |
Third-Party Inspection |
Underground Tank Installation |
Underground Tank Removal |
Underground Tank Repairs and Upgrades |
Veeder Root Testing and Certification